While not every home renovation runs in the corresponding order, you may desire to happen a specific plan to help circumvent unnecessary work. For example, you don't want to close walls and paint, only to realize you need to add a new plumbing stack that requires going behind the wall again.

MAKE A PLAN
Assess what you'd like to home extension and set preferences. That includes deciding where to rise and guarantee you possess the time and budget required preparing the work done.

SET A BUDGET
Come up with a definitive number on how much you can conveniently spend on the renovation. It may be an excellent idea to reduce Remodeling Magazine's annual Cost vs. Value Report to see how many average projects cost. Consider budgeting an extra 10 to 20 percent for unexpected costs that may arise.

HIRE A CONTRACTOR
Research and select a contractor for home renovation in Dubai with whom you feel comfortable. If you enter into a contract that clearly defines the scope of work upfront, it can serve as a useful reference point for you and your contractor throughout the renovation process.

TALK TO YOUR INSURANCE COMPANY
Consider contacting your insurance company before and after your project to ensure you have the amount of coverage that fits your needs. Your home renovation could raise your home's value, so you may want to increase your coverage limits, so your investment is better protected if it's damaged or destroyed. You'll also want to make sure your contractor has proper insurance.

SECURE PERMITS AND ORDER MATERIALS
Permits are typically required in many home renovations and can be critical to avoid certain issues impacting your project. Make sure your contractor checks your municipality's latest regulations since inspection rules change and vary in different locations.

Once you have the permits sorted out, you may want to start ordering the necessary materials like lumber, drywall, new windows, doors, etc.

START DEMOLITION
Once all your materials arrive at the job site and have been inspected, it's demolition time. If space is being added, then framing generally takes place. If walls within are being moved, it may be a good time to install any new windows and doors potentially.

WORK BEHIND THE WALLS
Generally, this is the time for critical work behind walls, below floors, and above ceilings – plumbing, electrical, heating, air conditioning rough-ins, subfloors, and insulation. Next, patch, hang drywall, tape, and sand for smooth exterior surfaces.

Author's Bio: 

PAINT AND INSTALL FLOORING
Some house renovation contractor may require finishing flooring first, while others fancy to prime and paint before managing the floor (to prevent spills from seizing on new flooring). The order may also depend upon your contractors' schedules.